	Green Leaf hybrid EAF
 
				AM Hochfeld in Duisburg is currently operating with 2 BOFs. Following the AM Green Leaf Hybrid EAF project towards CO2 reduction, AM Hochfeld Duisburg intends to build a HYBRID EAF in its facilities.
The HM supply for the plant, currently provided by thyssenkrupp Steel, is planned to end in 2025. Hereafter the AM plant in Hamburg will produce DRI for AM Hochfeld which will be delivered by train. This with the aim for a more flexible metallic charge.
Project scope: DRI unloading, scarp handling, EAF, dedusting, WWTP, Electric supply, Utilities, slag treatment, HVAC, logistics, HVAC, fire fighting, etc.
Realization
                
                    
                        start: 2022
                    
                
                
                    
                        - end: 2023
                    
                
            
            
        	
	        	Principal project data
Installation of a new 150T EAF in an existing steel plant, including all auxiliaries and utilities
Scope IPS
General Designer
- Project Management
- Basic Engeneering 	- Layout
- Civil & structures
- Piping
- E&I
- Mechanical
 
- Interface with OEM
- Budget